The Resource Providing an extension of time for claiming credit or refund with respect to war losses. June 16, 1948. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed., (electronic resource)
Providing an extension of time for claiming credit or refund with respect to war losses. June 16, 1948. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed., (electronic resource)
Resource Information
The item Providing an extension of time for claiming credit or refund with respect to war losses. June 16, 1948. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed., (electronic resource) represents a specific, individual, material embodiment of a distinct intellectual or artistic creation found in Bowdoin College Library.This item is available to borrow from 1 library branch.
Resource Information
The item Providing an extension of time for claiming credit or refund with respect to war losses. June 16, 1948. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed., (electronic resource) represents a specific, individual, material embodiment of a distinct intellectual or artistic creation found in Bowdoin College Library.
This item is available to borrow from 1 library branch.
- Label
- Providing an extension of time for claiming credit or refund with respect to war losses. June 16, 1948. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed.
- Title
- Providing an extension of time for claiming credit or refund with respect to war losses. June 16, 1948. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed.
- Language
- eng
- Cataloging source
- Readex
- Government publication
- federal national government publication
- Index
- no index present
- Literary form
- non fiction
- Nature of contents
- dictionaries
- http://bibfra.me/vocab/lite/organizationName
- United States
- http://library.link/vocab/relatedWorkOrContributorDate
- 1893-1971.
- http://library.link/vocab/relatedWorkOrContributorName
- Martin, Thomas Ellsworth
- Series statement
-
- United States congressional serial set;
- House report / 80th Congress, 2nd session. House
- Series volume
-
- serial set no. 11213
- no. 2371
- http://library.link/vocab/subjectName
-
- Claims
- Legislative amendments
- Limitation of actions
- Tax credits
- War damage compensation
- World War II (1939-1945)
- Label
- Providing an extension of time for claiming credit or refund with respect to war losses. June 16, 1948. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed., (electronic resource)
- Color
- multicolored
- Control code
- NB00000273715
- Dimensions
- unknown
- Extent
- 2 p
- Form of item
- electronic
- Governing access note
- Access restricted to subscribing institutions
- Reproduction note
- Electronic reproduction.
- Specific material designation
- remote
- System control number
- (Readex)11FCEB0A869C0C10
- Terms governing use
- ©2008 by NewsBank, Inc. All rights reserved
- Label
- Providing an extension of time for claiming credit or refund with respect to war losses. June 16, 1948. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed., (electronic resource)
- Color
- multicolored
- Control code
- NB00000273715
- Dimensions
- unknown
- Extent
- 2 p
- Form of item
- electronic
- Governing access note
- Access restricted to subscribing institutions
- Reproduction note
- Electronic reproduction.
- Specific material designation
- remote
- System control number
- (Readex)11FCEB0A869C0C10
- Terms governing use
- ©2008 by NewsBank, Inc. All rights reserved
Embed
Settings
Select options that apply then copy and paste the RDF/HTML data fragment to include in your application
Embed this data in a secure (HTTPS) page:
Layout options:
Include data citation:
<div class="citation" vocab="http://schema.org/"><i class="fa fa-external-link-square fa-fw"></i> Data from <span resource="http://link.bowdoin.edu/portal/Providing-an-extension-of-time-for-claiming/jnw4rlXX7bg/" typeof="Book http://bibfra.me/vocab/lite/Item"><span property="name http://bibfra.me/vocab/lite/label"><a href="http://link.bowdoin.edu/portal/Providing-an-extension-of-time-for-claiming/jnw4rlXX7bg/">Providing an extension of time for claiming credit or refund with respect to war losses. June 16, 1948. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed., (electronic resource)</a></span> - <span property="potentialAction" typeOf="OrganizeAction"><span property="agent" typeof="LibrarySystem http://library.link/vocab/LibrarySystem" resource="http://link.bowdoin.edu/"><span property="name http://bibfra.me/vocab/lite/label"><a property="url" href="http://link.bowdoin.edu/">Bowdoin College Library</a></span></span></span></span></div>
Note: Adjust the width and height settings defined in the RDF/HTML code fragment to best match your requirements
Preview
Cite Data - Experimental
Data Citation of the Item Providing an extension of time for claiming credit or refund with respect to war losses. June 16, 1948. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed., (electronic resource)
Copy and paste the following RDF/HTML data fragment to cite this resource
<div class="citation" vocab="http://schema.org/"><i class="fa fa-external-link-square fa-fw"></i> Data from <span resource="http://link.bowdoin.edu/portal/Providing-an-extension-of-time-for-claiming/jnw4rlXX7bg/" typeof="Book http://bibfra.me/vocab/lite/Item"><span property="name http://bibfra.me/vocab/lite/label"><a href="http://link.bowdoin.edu/portal/Providing-an-extension-of-time-for-claiming/jnw4rlXX7bg/">Providing an extension of time for claiming credit or refund with respect to war losses. June 16, 1948. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed., (electronic resource)</a></span> - <span property="potentialAction" typeOf="OrganizeAction"><span property="agent" typeof="LibrarySystem http://library.link/vocab/LibrarySystem" resource="http://link.bowdoin.edu/"><span property="name http://bibfra.me/vocab/lite/label"><a property="url" href="http://link.bowdoin.edu/">Bowdoin College Library</a></span></span></span></span></div>