The Resource Providing an extension of time for the authorization for certain projects for local flood protection in the Tennessee River Basin. March 20, 1952. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed., (electronic resource)

Providing an extension of time for the authorization for certain projects for local flood protection in the Tennessee River Basin. March 20, 1952. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed., (electronic resource)

Label
Providing an extension of time for the authorization for certain projects for local flood protection in the Tennessee River Basin. March 20, 1952. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed.
Title
Providing an extension of time for the authorization for certain projects for local flood protection in the Tennessee River Basin. March 20, 1952. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed.
Creator
Contributor
Subject
Genre
Language
eng
Member of
Cataloging source
Readex
Government publication
federal national government publication
Index
no index present
Literary form
non fiction
Nature of contents
dictionaries
http://bibfra.me/vocab/lite/organizationName
United States
http://library.link/vocab/relatedWorkOrContributorDate
1890-1967.
http://library.link/vocab/relatedWorkOrContributorName
Buckley, Charles Anthony
Series statement
  • United States congressional serial set;
  • House report / 82nd Congress, 2nd session. House
Series volume
  • serial set no. 11576
  • no. 1606
http://library.link/vocab/subjectName
  • Flood control
  • Chattanooga, Tennessee
  • Rossville, Georgia
  • Tennessee River
Label
Providing an extension of time for the authorization for certain projects for local flood protection in the Tennessee River Basin. March 20, 1952. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed., (electronic resource)
Instantiates
Publication
Color
multicolored
Control code
NB00000284572
Dimensions
unknown
Extent
1 p
Form of item
electronic
Governing access note
Access restricted to subscribing institutions
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
(Readex)120618D004F08E90
Terms governing use
©2008 by NewsBank, Inc. All rights reserved
Label
Providing an extension of time for the authorization for certain projects for local flood protection in the Tennessee River Basin. March 20, 1952. -- Committed to the Committee of the Whole House on the State of the Union and ordered to be printed., (electronic resource)
Publication
Color
multicolored
Control code
NB00000284572
Dimensions
unknown
Extent
1 p
Form of item
electronic
Governing access note
Access restricted to subscribing institutions
Reproduction note
Electronic reproduction.
Specific material designation
remote
System control number
(Readex)120618D004F08E90
Terms governing use
©2008 by NewsBank, Inc. All rights reserved

Library Locations

    • Bowdoin College LibraryBorrow it
      3000 College Station, Brunswick, ME, 04011-8421, US
      43.907093 -69.963997