The Resource Providing extension of time for authorization of certain projects for local flood protection in the Tennessee River Basin. March 25 (legislative day, March 24), 1952. -- Ordered to be printed., (electronic resource)
Providing extension of time for authorization of certain projects for local flood protection in the Tennessee River Basin. March 25 (legislative day, March 24), 1952. -- Ordered to be printed., (electronic resource)
Resource Information
The item Providing extension of time for authorization of certain projects for local flood protection in the Tennessee River Basin. March 25 (legislative day, March 24), 1952. -- Ordered to be printed., (electronic resource) represents a specific, individual, material embodiment of a distinct intellectual or artistic creation found in Bowdoin College Library.This item is available to borrow from 1 library branch.
Resource Information
The item Providing extension of time for authorization of certain projects for local flood protection in the Tennessee River Basin. March 25 (legislative day, March 24), 1952. -- Ordered to be printed., (electronic resource) represents a specific, individual, material embodiment of a distinct intellectual or artistic creation found in Bowdoin College Library.
This item is available to borrow from 1 library branch.
- Label
- Providing extension of time for authorization of certain projects for local flood protection in the Tennessee River Basin. March 25 (legislative day, March 24), 1952. -- Ordered to be printed.
- Title
- Providing extension of time for authorization of certain projects for local flood protection in the Tennessee River Basin. March 25 (legislative day, March 24), 1952. -- Ordered to be printed.
- Language
- eng
- Cataloging source
- Readex
- Government publication
- federal national government publication
- Index
- no index present
- Literary form
- non fiction
- Nature of contents
- dictionaries
- http://bibfra.me/vocab/lite/organizationName
- United States
- http://library.link/vocab/relatedWorkOrContributorDate
- 1896-1977.
- http://library.link/vocab/relatedWorkOrContributorName
- McClellan, John Little
- Series statement
-
- United States congressional serial set;
- Senate report / 82nd Congress, 2nd session. Senate
- Series volume
-
- serial set no. 11566
- no. 1349
- http://library.link/vocab/subjectName
-
- Flood control
- Legislative amendments
- Levees
- Right-of-way
- Chattanooga, Tennessee
- Tennessee Valley
- Label
- Providing extension of time for authorization of certain projects for local flood protection in the Tennessee River Basin. March 25 (legislative day, March 24), 1952. -- Ordered to be printed., (electronic resource)
- Color
- multicolored
- Control code
- NB00000284608
- Dimensions
- unknown
- Extent
- 1 p
- Form of item
- electronic
- Governing access note
- Access restricted to subscribing institutions
- Reproduction note
- Electronic reproduction.
- Specific material designation
- remote
- System control number
- (Readex)1205C6A3D3E2FCF8
- Terms governing use
- ©2008 by NewsBank, Inc. All rights reserved
- Label
- Providing extension of time for authorization of certain projects for local flood protection in the Tennessee River Basin. March 25 (legislative day, March 24), 1952. -- Ordered to be printed., (electronic resource)
- Color
- multicolored
- Control code
- NB00000284608
- Dimensions
- unknown
- Extent
- 1 p
- Form of item
- electronic
- Governing access note
- Access restricted to subscribing institutions
- Reproduction note
- Electronic reproduction.
- Specific material designation
- remote
- System control number
- (Readex)1205C6A3D3E2FCF8
- Terms governing use
- ©2008 by NewsBank, Inc. All rights reserved
Embed
Settings
Select options that apply then copy and paste the RDF/HTML data fragment to include in your application
Embed this data in a secure (HTTPS) page:
Layout options:
Include data citation:
<div class="citation" vocab="http://schema.org/"><i class="fa fa-external-link-square fa-fw"></i> Data from <span resource="http://link.bowdoin.edu/portal/Providing-extension-of-time-for-authorization-of/GJwX9_AqaII/" typeof="Book http://bibfra.me/vocab/lite/Item"><span property="name http://bibfra.me/vocab/lite/label"><a href="http://link.bowdoin.edu/portal/Providing-extension-of-time-for-authorization-of/GJwX9_AqaII/">Providing extension of time for authorization of certain projects for local flood protection in the Tennessee River Basin. March 25 (legislative day, March 24), 1952. -- Ordered to be printed., (electronic resource)</a></span> - <span property="potentialAction" typeOf="OrganizeAction"><span property="agent" typeof="LibrarySystem http://library.link/vocab/LibrarySystem" resource="http://link.bowdoin.edu/"><span property="name http://bibfra.me/vocab/lite/label"><a property="url" href="http://link.bowdoin.edu/">Bowdoin College Library</a></span></span></span></span></div>
Note: Adjust the width and height settings defined in the RDF/HTML code fragment to best match your requirements
Preview
Cite Data - Experimental
Data Citation of the Item Providing extension of time for authorization of certain projects for local flood protection in the Tennessee River Basin. March 25 (legislative day, March 24), 1952. -- Ordered to be printed., (electronic resource)
Copy and paste the following RDF/HTML data fragment to cite this resource
<div class="citation" vocab="http://schema.org/"><i class="fa fa-external-link-square fa-fw"></i> Data from <span resource="http://link.bowdoin.edu/portal/Providing-extension-of-time-for-authorization-of/GJwX9_AqaII/" typeof="Book http://bibfra.me/vocab/lite/Item"><span property="name http://bibfra.me/vocab/lite/label"><a href="http://link.bowdoin.edu/portal/Providing-extension-of-time-for-authorization-of/GJwX9_AqaII/">Providing extension of time for authorization of certain projects for local flood protection in the Tennessee River Basin. March 25 (legislative day, March 24), 1952. -- Ordered to be printed., (electronic resource)</a></span> - <span property="potentialAction" typeOf="OrganizeAction"><span property="agent" typeof="LibrarySystem http://library.link/vocab/LibrarySystem" resource="http://link.bowdoin.edu/"><span property="name http://bibfra.me/vocab/lite/label"><a property="url" href="http://link.bowdoin.edu/">Bowdoin College Library</a></span></span></span></span></div>